Banks Power

BANKS 1500° PYROMETER GAUGE w/ EXTENDED 55' LONG LEAD -TURBO DIESEL MOTORHOME RV

  • Sale
  • Regular price $253.58



PPW, *BANKS AUTHORIZED DEALER SINCE 2009 & FULL WARRANTY*. FREE SUPPORT 9AM-5PM PACIFIC TIME (6I9)26I-8565.

DynaFact® Pyrometer

  • Monitors exhaust gas temperature (EGT) in diesels
  • Fits 2 1/16" diameter gauge holes
  • Protects durability by eliminating safe-EGT-level guesswork
  • Eliminates erroneous readings with ambient temperature compensation
  • Accurate within 15°F at maximum operating temperatures
  • 2000°F-rated, chromel-alumel thermocouple wire provides superior conductivity
  • Illuminated 0-1500°F full-sweep face
  • 1-year Warranty
  • Sender and basic installation kit included.  Additional wiring/connectors may be required
  • Mounting/gauge pods available separately

Pyrometer Gauge Kit
w/Probe
55' Lead Wire Universal
Installation